• Recent Posts

    • Build Update 1/23/15

      Build Update 1/23/15

      Finished drive train modifications. Preparing to assemble drive train, and build more parts. CAD for elevator being finished.Read More »
    • Build Update 1/26/15

      Build Update 1/26/15

      Assembled frame of drive train. Continued to work on lifting arms. Preparing to construct elevator mechanism.Read More »
    • Build Update 1/14/15

      Build Update 1/14/15

      Got mecanum drive train working. Finalized overall design of the robot.Read More »
    • Build Update 1/22/15

      Build Update 1/22/15

      We continued to work on the lifting mechanism, the drive train, and the E-Plate.Read More »
    • Build Update 1/15/15

      Build Update 1/15/15

      Fixed drive train with previous design, and began building new mecanum drive train. Waiting for parts to arrive in order to finish the rest of it. Robot code tested on previous drive train.Read More »